Unique Development Site In Downtown Alliston! Two Possible Developments Can Occur: 1) Approx 36 Stacked Townhomes With Interior Courtyard – As Of Right Based On Current Zoning! 2) Approx 60 Unit Mixed Use Building With Commercial On The Ground Floor – Zoning Amendment Would Be Required. Township Has Shown Keen Interest In Developing This Site Into Either Option. Renderings And Massing Have Been Completed For The Building Option As Per The Townships Requirements. Take Advantage Of The Lack Of New Supply Of Housing Being Constructed In New Tecumseth! Two Property Land Assembly – Includes 21 Boyne Street. Downtown Commercial Transition (DCT) and Lowrise Residenital (LR). Quick Access To Highway 400 And Other Major Centers Attracts Large Employers Into The Area Such As: Honda Of Canada Manufacturing, Baxter Canada, F&P Manufacturing, And Stevenson Memorial Hospital. Honda Anticipated To Further Increase Their Investments In The Manufacturing Of Electric Vehicles Upwards Of $18 Billion.